Recommended
Action Plan
Install Bioxide (or Ferric Chloride) chemical feed system at Lift Station A
- Lease chemical feed and storage equipment from supplier (if possible)
- Low initial capital cost, relatively high annual O&M cost
- Provide a means for control before summer 2008
Construct a chemical access point on the force main
- Provide ability to pilot other chemicals
- Evaluate potential to reduce ongoing annual O&M costs
Proceed with finalizing design for headworks
- Sized to divert a portion of flows into lagoons